Colorado Journeyman PrepLicense, exam and code, in one place Start the free practice testPractice exam

Checked against primary sources 2026-09-05

Which Colorado Electrician License Are You On?

Two questions and this page names the credential your situation points at, what State Electrical Board asks for, what it costs, and the mistake people make on that route. Every path is written out below, so you can read the whole set instead of answering anything.

Test yourself: thirty free questions, timed

Every path on this page
  1. Electrical Apprentice
  2. Residential Wireman
  3. Journeyman Electrician
  4. Master Electrician
  5. Electrical Contractor
  6. Photovoltaic Installer
  7. License by reciprocity
  8. License by endorsement
  9. Renewing
  10. Moving up a grade
  11. Reinstating an expired license
  12. Going inactive, or coming back

Electrical Apprentice APE

It lets you work at the trade under direct supervision, and your employer is the one who files it.

C.R.S. 12-115-115

RegistrationYour employer registers you with the Board within 30 days of your first day, and tells the Board within 30 days when you leave.State Electrical Board apprentice page
HoursNone published to register. No age, diploma or schooling requirement appears on the application preview either. The hours you bank here feed the journeyman 8,000 and the residential wireman 4,000.State Electrical Board apprentice application preview and applications page
SupervisionYour supervising licensed electrician has to be physically present at the same physical address, and no licensed electrician may supervise more than three apprentices at a job site.C.R.S. 12-115-103 and 12-115-115(1)
ExamNone to register. Registered six years with 8,000 hours and the other journeyman requirements met, and you have to sit the journeyman paper at least every three years until you pass.C.R.S. 12-115-115(4)(a)(I)
FeesNo apprentice registration fee is published on any reachable state page. C.R.S. 12-115-117(1)(l) authorizes one and sets no amount, and there's no fee for reporting a termination.C.R.S. 12-115-117(1)(l)

Get your hours record before you leave an employer.

Your employer keeps the record of your hours split residential against commercial or industrial, and rule 1.6.C makes them hand it over when you leave or when you ask for it. Ask while you still work there. The license application later wants exact employment dates, a breakdown by work type and supervisor signatures, and chasing that from a company that has changed hands is how good hours get lost.

3 CCR 710-1.6.C

Residential Wireman RW

It licenses you to wire and install for one, two, three and four family dwellings, on half the hours the journeyman license asks for.

C.R.S. 12-115-110(3)

Hours4,000 hours of residential only experience earned in no less than 2 years. The statute allows at least two years of accredited training as the alternative.C.R.S. 12-115-110(3)
SchoolingNo fixed classroom hour figure is published for this license. The 288 hour requirement is written into the journeyman requirements instead.State Electrical Board applications page
Exam90 scored items in 240 minutes, 63 correct to pass, with up to 7 unscored items and 30 more minutes. PSI supplies the code book and you may not mark it.PSI bulletin 3395
Fees$78 to sit and $73 to retest, not refundable and valid for one year from payment. No state application or license fee is published.PSI bulletin 3395
TermSeptember 30 every three years. This cycle expires 9/30/2026 and the Board says renewal runs through 11/30/2026, with 24 hours of CE behind it.State Electrical Board applications page and continuing education page
ScopeCommercial and industrial work sits outside the license. C.R.S. 12-115-109(2) bars work beyond what the license authorizes.C.R.S. 12-115-109(2)

A commercial job site makes you an apprentice again.

A licensed residential wireman working commercial has to be registered as an electrical apprentice and supervised by a journeyman or master electrician. Your employer files that registration all over again. It isn't a technicality either, because this is how most people earn the 2,000 commercial hours the journeyman license asks for later.

3 CCR 710-1.6.A.2

Journeyman Electrician JW

It drops the dwelling size limit, and it asks for 8,000 hours with a commercial block inside them.

C.R.S. 12-115-110(2)(a)(I)

Hours8,000 hours earned in no less than 4 years, 2,000 of them in commercial, industrial or substantially similar work over at least 2 years.C.R.S. 12-115-110(2)(a)(I)
Schooling288 classroom hours, required for all applicants with no grandfathering of any apprentice registration. The statute puts them in the last eight years and the rule says the last four, so both get printed here.3 CCR 710-1.7 against C.R.S. 12-115-110(2)
Exam90 scored items in 240 minutes, 63 correct to pass, sat before the application goes in. PSI hands you the book and you may not write on it.PSI bulletin 3395
Fees$78 to sit and $73 to retest. No state application, license or renewal fee is published, and C.R.S. 12-115-117 sets no amounts.PSI bulletin 3395 and C.R.S. 12-115-117
TermSeptember 30 every three years. This cycle expires 9/30/2026 with renewal through 11/30/2026, and CE is 24 hours per period.State Electrical Board applications page and continuing education page
EmploymentYou have to be employed by a Colorado electrical contractor and registered as an apprentice with that company to do electrical work here, unless you fit one of four exemptions.State Electrical Board journeyman application preview

The exam comes before the application, not after.

Colorado's order is hours, then class, then exam, then paperwork. The Board's own journeyman preview asks you to have achieved a passing score on the PSI examination before you file, and the master preview says it in stronger words. The other half of that preview is blunter still: if you have not obtained this experience yet, do not apply.

State Electrical Board journeyman application preview

Master Electrician ME

It adds planning, laying out and supervising to your scope, and it is the license a company has to have behind its contractor registration.

C.R.S. 12-115-110(1)

HoursFour routes. 10,000 hours in no less than 5 years. An electrical engineering degree with 2,000 construction hours in no less than 1 year. A trade school or community college qualification with 8,000 hours in no less than 4 years. Or 2,000 hours in no less than 1 year on top of the journeyman requirements.State Electrical Board applications page
SupervisionRoute four wants some of those 2,000 hours in planning and layout, and some in supervision earned while you hold the journeyman license.C.R.S. 12-115-110(1)(III)
SchoolingNo separate classroom figure for master. The 288 hours sit in the journeyman requirements that route four builds on, and the Board's page doesn't settle how they apply on the 10,000 hour route.State Electrical Board applications page
Exam90 scored items in 240 minutes, 63 correct to pass. The Board's preview says you must have taken and passed it before submitting the application.PSI bulletin 3395
Fees$78 to sit and $73 to retest. C.R.S. 12-115-117(1)(a), (1)(b) and (1)(e) authorize the license, renewal and examination fees without setting amounts.C.R.S. 12-115-117
TermSeptember 30 every three years. This cycle expires 9/30/2026 with renewal through 11/30/2026, and CE is 24 hours per period.State Electrical Board applications page and continuing education page

Log planning and supervision hours from the day you get your journeyman card.

Route four is the working electrician's route and it's the only one that names the kind of hour it wants. Some of the 2,000 have to be planning and layout, and some have to be supervision earned while you hold the journeyman license. Nobody reconstructs that from memory years later, so record those hours separately as you go.

C.R.S. 12-115-110(1)(III)

Electrical Contractor EC

A business registration rather than a personal license, carried by a master electrician who signs for the company's work.

C.R.S. 12-115-110(5)

RequirementHold or employ a licensed master electrician as the responsible individual, named on an Acknowledgement of Responsibility form signed by the owner and that master.State Electrical Board applications page
ExamNone. All four Colorado papers are for individual licenses, and there's no experience or schooling requirement for the company itself.PSI bulletin 3395
PermitsThe contractor pulls the permits. A valid Colorado State Electrical permit has to be obtained before installing electrical wiring where the state inspects.State Electrical Board permit and inspection page
SupervisionOne licensed electrician to three apprentices at a job site, and the company is responsible for the work its apprentices do. A first ratio violation is $375.3 CCR 710-1.10 and C.R.S. 12-115-115
FeesNo registration or renewal fee is published. C.R.S. 12-115-117(1)(g) and (1)(h) authorize both and set no amount.C.R.S. 12-115-117(1)(g) and (1)(h)
TermSeptember 30 every three years, the same cycle as the licenses. No CE attaches to the registration itself, only to the licenses your people hold.State Electrical Board applications page
LocalMost cities register contractors on top of the state. Pikes Peak Regional Building charges $50, Thornton registers Class D with no fee for two years, and Lakewood issues a three year Class B.City building department registration pages

The registration freezes the day your master electrician leaves.

321 Colorado registrations were sitting in a status called Need Master Hire, Cannot Practice in the September 2026 data. The record still exists and the company cannot work until another master is attached to it. If your only master is thinking about leaving, treat it as a licensing event rather than an HR one and start looking before the last day.

3 CCR 710-1.13.E

Photovoltaic Installer

A new company registration under Senate Bill 25-165 with a hard deadline of December 31, 2026, and the application isn't open yet.

C.R.S. 12-115-110(7)

DeadlineRegistration with the Board no later than December 31, 2026. The Board says applications will be available in late 2026 and asks people to apply as soon as they open.State Electrical Board applications page
WhoA contractor operating as of September 1, 2025 that performs photovoltaic installer work with at least one NABCEP certified employee. It's a company registration, not a personal card.C.R.S. 12-115-110(7)
ConditionsEmploy at least one NABCEP certified employee, have a designated agent, and be in good standing with the state and registered with the Colorado Secretary of State.State Electrical Board applications page
ExamNone published. No application form, no renewal cycle and no continuing education requirement is in print yet, because applications are not open.State Electrical Board applications page
FeesNo figure. C.R.S. 12-115-117(1)(m) authorizes a photovoltaic installer registration fee and sets no amount.C.R.S. 12-115-117(1)(m)
HoursSolar hours now feed the electrician licenses. 2,000 hours as a NABCEP PV installation professional count toward the journeyman 8,000 and the residential wireman 4,000, while two other routes credit one hour for every two worked.C.R.S. 12-115-110(6)

Lose the designated agent and the registration cannot be reinstated.

The Board's wording is harder here than it is for contractors. If the agents are no longer employed with the photovoltaic installer, the registration is invalid and cannot be reinstated. A contractor registration in the same position waits in Need Master Hire for a replacement. This one doesn't wait, so work out now who your agent is and how you would replace one.

State Electrical Board applications page

License by reciprocity

If your journeyman or master certificate came from one of the 14 agreement states by state examination, this is the shorter door.

C.R.S. 12-115-113(2)

StatesAlaska, Arkansas, Idaho, Iowa, Minnesota, Montana, Nebraska, New Hampshire, New Mexico, North Dakota, Oklahoma, South Dakota, Utah and Wyoming. The Board's journeyman preview adds that Texas is not a reciprocal state.State Electrical Board applications page
ConditionsA current, active journeyman or master certificate in good standing, gained through a state administered examination with a passing score, and held for at least 1 year.State Electrical Board applications page
GradesJourneyman and master certificates only. A residential wireman coming from another state goes through endorsement instead.State Electrical Board applications page
ExamNone published. No reciprocity examination and no Colorado laws and rules test appears on the Board's pages we read.State Electrical Board applications page
AlternativeRule 1.7 adds a route for a license from a state in good standing with the National Electrical Reciprocal Alliance, but NERA publishes no member roster, only a map with no states named.3 CCR 710-1.7

A certificate you were grandfathered into doesn't qualify.

The middle condition is the one that stops people. The Board wants the certificate gained through a state administered examination with a passing score, so a card issued by grandfathering or by any route other than a state exam sits outside the agreement. You also have to have held it for at least a year. If you're leaning on the NERA route instead, ask the Board to confirm your state in writing first.

State Electrical Board applications page

License by endorsement

Open to any state on substantial equivalence, and it still wants the Colorado hour totals and a verification form from your own board.

C.R.S. 12-115-113(1)

TestYour license has to be active, issued and regulated by the state, and gained by testing on the current National Electrical Code in use in Colorado.State Electrical Board applications page
HoursThe same totals a Colorado applicant carries. 8,000 hours in no less than 4 years for journeyman, 10,000 hours in no less than 5 years for master.State Electrical Board application previews
PaperworkA Verification of Licensure form completed by your issuing state board. The Board publishes the form, and a Spanish language endorsement and reciprocity application.State Electrical Board applications page
GradesThis is the only route for a residential wireman, because the reciprocity agreement runs to journeyman and master certificates only.State Electrical Board applications page
Working hereIf you perform electrical work in Colorado while it's pending you need to be employed by a Colorado electrical contractor and registered as an apprentice with them. Not residing in Colorado is one of the four exemptions.State Electrical Board journeyman application preview

Two live state documents name different code editions.

The Board's application previews all say the current NEC code in use in Colorado is the 2023 NEC, and the residential preview adds that a license tested on a different version isn't eligible. Against that, the rule filing under tracking number 2026-00171 put Colorado on the 2026 edition from July 15, 2026, and PSI has tested it since August 1. Both are live state documents. Call the Board on 303-894-7800 and get the answer in writing.

3 CCR 710-1.5 against the Board's application previews

Renewing

Every license and contractor registration expires on September 30 every three years, with 24 hours of continuing education behind the renewal.

3 CCR 710-1.13.A

TermSeptember 30 every three years. The Board says the current licenses expire on 9/30/2026 and can be renewed through 11/30/2026.State Electrical Board homepage
CE24 hours per three year period for active master, journeyman and residential wireman licenses, with at least four hours in National Electrical Code changes and no more than four in safety.State Electrical Board continuing education page
ExemptionThe 24 hours don't apply to the first renewal of a license you got by passing a licensing examination.State Electrical Board continuing education page
RecordsYou keep your own CE records for at least seven years, and compliance audits are conducted after each license period.State Electrical Board continuing education page
Grace60 days, during which renewal is possible without disciplinary sanction. A delinquency fee is charged for late renewal and the amount isn't published.3 CCR 710-1.13.A
FeesNo renewal fee is published on any reachable state page. Read the amount on the DORA application screen rather than from a third party table.C.R.S. 12-115-117

Four safety hours is the ceiling, not the plan.

The 24 hours have a floor and a ceiling inside them. At least four have to be in the National Electrical Code changes competency, and no more than four may be in safety. Book the code changes hours first, because that's the part with a minimum. This cycle they land on an edition Colorado only adopted in July 2026, so ask your provider which edition the course covers.

State Electrical Board continuing education page

Moving up a grade

Residential wireman to journeyman runs on commercial hours, and journeyman to master runs on planning and supervision hours.

C.R.S. 12-115-110

Hours to journeyman8,000 hours in no less than 4 years with 2,000 in commercial or industrial work, plus the 288 classroom hours the Board requires of all applicants.State Electrical Board applications page
Hours to master2,000 hours in no less than 1 year beyond the journeyman requirements, some in planning and layout, some in supervision while you hold the journeyman license.C.R.S. 12-115-110(1)(III)
SupervisionA residential wireman earning commercial hours registers as an apprentice for that work and is supervised by a journeyman or master electrician.3 CCR 710-1.6.A.2
ExamA new grade means a new PSI paper, 90 scored items in 240 minutes at 63 correct to pass, and you sit it before the application.PSI bulletin 3395
RecordsThe application wants documented evidence of all in state and out of state experience, with exact employment dates, the work split by type and supervisor signatures.3 CCR 710-1.7

Holding a license doesn't exempt you from registering again.

A licensed residential wireman on a commercial job site has to be registered as an electrical apprentice and supervised by a journeyman or master. That is the mechanism for earning the 2,000 commercial hours the journeyman license asks for, and the filing sits with your employer. Ask them to do it on day one rather than after the hours are already worked.

3 CCR 710-1.6.A.2

Reinstating an expired license

What it takes depends on how late you are, and the lines are drawn at 60 days and again at two years.

3 CCR 710-1.13.B

Inside 60 daysRenewal is still possible without disciplinary sanction inside the grace period, with a delinquency fee whose amount isn't published.3 CCR 710-1.13.A
Under two yearsExpired more than 60 days but less than 2 years: complete 24 hours of continuing education.3 CCR 710-1.13.B
Over two yearsPass the state examination, or verify an active license in a reciprocal state, or verify an active license in a non-reciprocal state plus 24 hours of CE, or use a Board approved alternative.3 CCR 710-1.13.B
FormsThe Board publishes reinstatement checklists on its applications page, one for journeyman and one for master and residential wireman.State Electrical Board applications page
FinesUnlicensed journeyman work is $225 for a first offense and unlicensed master work is $300, then $600 for a second, then up to $2,000 per day.3 CCR 710-1.10

Working on an expired license is its own offense.

The rule says practicing on an expired license past the grace period can be disciplined, and the fine schedule prices unlicensed work separately from whatever reinstatement costs you. The renewal window catches plenty of people: 4,438 residential wireman licenses were expired in the September 2026 data against 2,032 active. Stop working at the expiry date rather than when a letter turns up.

3 CCR 710-1.13.A

Going inactive, or coming back

You can park a license without taking continuing education, and you can't work on it while it's parked.

3 CCR 710-1.13.D

StatusRule 1.13.D lets a licensee go inactive without CE, with the condition that an inactive licensee may not practice.3 CCR 710-1.13.D
ReactivationIt follows the same timelines as reinstatement. Under two years that's 24 hours of CE, over two years it's the state examination or a verified out of state license.3 CCR 710-1.13.B and 1.13.D
CEThe 24 hour requirement attaches to active master, journeyman and residential wireman licenses, which is why the inactive status carries none.State Electrical Board continuing education page

This is a reading of State Electrical Board material, and it is not advice and not an application. Check anything that decides money or a deadline against the source named beside it.

If your notes still say 2023

The 2023 to 2026 section crosswalk maps every section that moved, both directions, $29 once.

NEC and National Electrical Code are registered trademarks of the National Fire Protection Association.

Trojan Digital Marketing is an independent company. We are not affiliated with, endorsed by, or sponsored by NFPA, the Colorado State Electrical Board, PSI, or any licensing authority, school or union.

The Colorado examinations are open book only in the sense that PSI puts a book on the desk. PSI provides the National Electrical Code and a formula page at the test center, bars writing, highlighting, underlining and indexing on them, and allows no other materials. The questions have followed the 2026 edition since 1 August 2026, and the 2023 book is provided on request until 1 November 2026.

All practice questions are original. They are not actual exam questions.

Built and maintained by Jeff Clerisier, Trojan Digital Marketing.

Free, weekly

One exam question a week, worked all the way through

One original question in the Colorado style, the arithmetic worked, the code section named, and a short note whenever a Colorado licensing or code rule moves. Unsubscribe in one click.